The Energy Department of the Velocity Interoperability Network is responsible for the generation and supply of electricity, gas and heat to the sites of the Velocity Interoperability Network. Five generating stations with a combined capacity of 412 megawatts serve the Network. Their output is directed from the Department's supply control room at Central Exchange to meet demand at the six principal sites and the smaller sites connected to them.

This page summarises the Department's first Generation and Supply Statement, published on 6 September 2026. The statement records the position at establishment and the demand met during the transition period from 10 August to 5 September 2026, when the stations and the control room operated under interim arrangements before their transfer to the Department.

The position at establishment. The figures below record the capacity serving the Network and the demand it met during the transition period.

412 MW
Generating capacity serving the Network at establishment
286 MW
Peak demand, recorded on the evening of 27 August 2026
37.7%
Share of electricity supplied from renewable sources during the transition period
99.97%
Supply availability across the six principal sites, 10 August to 5 September 2026

The generation mix. Of the 128.4 gigawatt hours supplied during the transition period, the shares by source were as follows. Wind, solar and hydro together supplied 48.4 gigawatt hours, a renewable share of 37.7 per cent, which is the baseline for the Renewable Programme.

40.6%
Gas turbine generation at Ridgeway
21.7%
Combined heat and power at Southbank
22.7%
Wind, from Fenmoor Wind Array
15.0%
Solar and hydro, from Eastfield, the rooftop arrays and Coldwater

Generating stations. The register below records each station serving the Network, its type and capacity, its output during the transition period and the point at which it is connected to the Network supply.

Generating stations serving the Network, at 6 September 2026
StationTypeCapacityOutput, 10 August to 5 SeptemberConnection
Ridgeway Gas Turbine StationCombined-cycle gas turbine180 MW52.1 GWh132 kV, Ridgeway Switching Station
Southbank Combined Heat and Power StationGas-fired combined heat and power64 MW27.9 GWh33 kV, Southbank Primary Substation
Fenmoor Wind ArrayOnshore wind, 24 turbines of 4 MW96 MW29.1 GWh132 kV, Fenmoor Collector Substation
Eastfield Solar Array and rooftop arraysGround-mounted solar, 36 MW; rooftop arrays at the principal sites, 12 MW48 MW8.3 GWh33 kV, Eastfield Primary Substation; site substations
Coldwater Hydro StationRun-of-river hydro, two turbines24 MW11.0 GWh33 kV, Coldwater Switching Station
Total412 MW128.4 GWh

Ridgeway Gas Turbine Station is the station that follows demand: its output is raised and lowered by the control room as wind and solar output varies through the day. Fenmoor Wind Array reached its full output on eleven days of the transition period. Coldwater Hydro Station ran at a steady 17 megawatts throughout, its output limited by river flow in late summer.

Demand by site. Average and peak demand at each principal site during the transition period are set out below. The Network peak of 286 megawatts occurred at 18:40 on 27 August 2026, when the peaks of Central Exchange and Southbank Terminal coincided.

Demand by site, 10 August to 5 September 2026
SiteAverage demandPeak demandShare of electricity supplied
Central Exchange77 MW112 MW38.9%
Southbank Terminal33 MW43 MW16.7%
Northgate Relay28 MW38 MW14.1%
Westbrook Distribution Site25 MW36 MW12.6%
Eastfield Campus19 MW28 MW9.6%
Meridian Court8 MW11 MW4.0%
Other sites and network losses8 MW18 MW4.0%
Network198 MW286 MW100%

The Department's responsibilities for supply. The four areas below describe how the Department keeps the Network supplied.

Balancing generation and demand
The supply control room at Central Exchange, staffed continuously, directs the output of the generating stations to meet demand across the Network, calls on Ridgeway to follow demand as wind and solar output varies, and holds a reserve of not less than 40 megawatts at all times.
Security of supply
Each principal site is connected to the Network supply through a primary substation with two transformers, either of which can carry the full load of the site. The Department maintains the connection register, schedules the maintenance of substations and lines, and reports supply availability quarterly.
Gas and heat
Gas is supplied to the boiler plant at each principal site and to Ridgeway and Southbank. Southbank Combined Heat and Power Station supplies heat to the Southbank Terminal heat network. The Department oversees the supply and the safety of the installations that use it.
The Generation and Supply Statement
The Department publishes a statement each quarter recording capacity, output and the generation mix by station, demand by site, supply availability and progress against the Renewable Programme target. The first statement, covering the transition period, is summarised on this page.

The Department will publish the Generation and Supply Statement quarterly. The next statement, covering the quarter ending 30 September 2026, will be published in October 2026 and announced in the Newsroom. For the connection points named above, see Connections; for the schedule of planned outages affecting supply, see Outages and Emergencies. Questions about the statement may be sent to contact@energy.gov.vin.