The Energy Department of the Velocity Interoperability Network schedules the planned outages needed to maintain the Network supply, responds to supply faults from its control room at Central Exchange, and coordinates the response to energy emergencies with the duty officers at each site. The control room has been staffed continuously since 10 August 2026.
In an emergency
Planned outages. The schedule below records every planned outage to 18 October 2026. Outages are scheduled overnight wherever possible and are published at least twenty working days in advance; occupants of an affected site are notified by their member organisation at least ten working days before. The schedule is updated as outages are added or completed.
| Site | Date | Hours | Area affected | Purpose |
|---|---|---|---|---|
| Northgate Relay | Sunday 13 September 2026 | 02:00 to 06:00 | Northgate Primary Substation, transformer 2 and the east wing | Transformer maintenance |
| Meridian Court | Sunday 20 September 2026 | 01:00 to 05:00 | Whole site | Switchgear inspection, Class A |
| Westbrook Distribution Site | Saturday 26 September 2026 | 22:00 to 02:00 | Warehouses 3 to 6 | Replacement of an 11 kV cable |
| Eastfield Campus | Sunday 4 October 2026 | 02:00 to 07:00 | Whole site | Connection of the Eastfield Solar Array extension |
| Southbank Terminal | Sunday 18 October 2026 | 01:00 to 05:00 | Terminal building and heat network pumps | Protection testing at the combined heat and power station |
Sites with two transformers remain supplied through the second transformer during maintenance of the first; only the area named in the schedule loses supply. Where a whole site is affected, standby generation is provided for the site's emergency lighting, communications and any plant the member organisation has designated as essential.
Reporting a supply fault. The steps below apply to any unplanned loss of electricity, gas or heat at a site of the Network.
Step 1: Check whether the outage is planned
Consult the schedule on this page. Planned outages are published at least twenty working days in advance and occupants are notified by their member organisation at least ten working days before.
Step 2: Tell the duty officer at your site
Every site has a duty officer who holds the direct line to the Department's supply control room at Central Exchange. Give the building, the time the supply was lost and whether any equipment is at risk.
Step 3: Write to the Department
Send the site, the building, the time the supply was lost and the name of the duty officer informed to the Department's email address, so that the fault is recorded against the connection.
Step 4: Do not attempt to restore supply
Do not reset tripped high-voltage switchgear, open substations or interfere with gas or heat plant. The control room will isolate the fault, restore supply by an alternative route where one exists and dispatch a fault team.
Step 5: Receive confirmation
The Department confirms by email when supply is restored and, for interruptions of more than one hour, the cause and the steps taken to prevent recurrence.
Energy emergencies. The guidance below covers the emergencies the Department plans for. It supplements, and does not replace, the emergency procedures of your site.
- Electrical fire or arcing
- Raise the site fire alarm, leave the area and tell the duty officer. Do not use water on electrical equipment. The control room isolates the supply to the building on the duty officer's report.
- Smell of gas
- Do not operate electrical switches, open doors and windows, leave the building and tell the duty officer, who will have the gas supply to the building isolated. Do not re-enter until the Department's inspector has declared the building safe.
- Fallen or damaged overhead line
- Keep at least ten metres away and keep others away. Treat every line as live. Tell the duty officer, who will have the line isolated before anyone approaches it.
- Loss of heat at Southbank Terminal
- The heat network is supplied by Southbank Combined Heat and Power Station with the boiler plant as standby. Report a loss of heat to the duty officer; standby boilers are brought on within thirty minutes.
- Widespread loss of supply
- If supply is lost at more than one site, the control room follows the restoration order agreed with member organisations: Central Exchange, Southbank Terminal, Northgate Relay, Westbrook Distribution Site, Eastfield Campus, Meridian Court and then the smaller sites. Member organisations are kept informed by email throughout.
Unplanned interruptions during the transition period. Five unplanned interruptions were recorded between 10 August and 5 September 2026. Supply availability across the six principal sites over the period was 99.97 per cent.
| Site | Date | Duration | Area affected | Cause and restoration |
|---|---|---|---|---|
| Northgate Relay | 14 August 2026 | 23 minutes | East wing | Transformer 2 protection operated; supply restored from transformer 1 |
| Meridian Court | 19 August 2026 | 1 hour 12 minutes | Whole site | Cable fault on the 11 kV feeder; repaired and re-energised |
| Westbrook Distribution Site | 27 August 2026 | 41 minutes | Warehouses 3 to 6 | Cable joint failure; supply restored by alternative route |
| Eastfield Campus | 1 September 2026 | 8 minutes | Laboratory block | Low-voltage board tripped; reset by fault team |
| Southbank Terminal | 4 September 2026 | 17 minutes | Terminal building | Combined heat and power station tripped; supply restored from the Network |
Interruptions and availability are reported quarterly on the Statistics page. For the connection points named in the schedule, see Connections; for the reporting of dangerous installations, see Installation Safety. Questions about the schedule may be sent to contact@energy.gov.vin.