Outages and Emergencies

The Energy Department of the Velocity Interoperability Network schedules the planned outages needed to maintain the Network supply, responds to supply faults from its control room at Central Exchange, and coordinates the response to energy emergencies with the duty officers at each site. The control room has been staffed continuously since 10 August 2026.

In an emergency

Tell the duty officer at your site at once. The duty officer holds the direct line to the Department's supply control room and can have the supply to a building isolated. Write to contact@energy.gov.vin once the immediate danger has passed so that the event is recorded.

Planned outages. The schedule below records every planned outage to 18 October 2026. Outages are scheduled overnight wherever possible and are published at least twenty working days in advance; occupants of an affected site are notified by their member organisation at least ten working days before. The schedule is updated as outages are added or completed.

Schedule of planned outages, 6 September to 18 October 2026
SiteDateHoursArea affectedPurpose
Northgate RelaySunday 13 September 202602:00 to 06:00Northgate Primary Substation, transformer 2 and the east wingTransformer maintenance
Meridian CourtSunday 20 September 202601:00 to 05:00Whole siteSwitchgear inspection, Class A
Westbrook Distribution SiteSaturday 26 September 202622:00 to 02:00Warehouses 3 to 6Replacement of an 11 kV cable
Eastfield CampusSunday 4 October 202602:00 to 07:00Whole siteConnection of the Eastfield Solar Array extension
Southbank TerminalSunday 18 October 202601:00 to 05:00Terminal building and heat network pumpsProtection testing at the combined heat and power station

Sites with two transformers remain supplied through the second transformer during maintenance of the first; only the area named in the schedule loses supply. Where a whole site is affected, standby generation is provided for the site's emergency lighting, communications and any plant the member organisation has designated as essential.

Reporting a supply fault. The steps below apply to any unplanned loss of electricity, gas or heat at a site of the Network.

  1. Step 1: Check whether the outage is planned

    Consult the schedule on this page. Planned outages are published at least twenty working days in advance and occupants are notified by their member organisation at least ten working days before.

  2. Step 2: Tell the duty officer at your site

    Every site has a duty officer who holds the direct line to the Department's supply control room at Central Exchange. Give the building, the time the supply was lost and whether any equipment is at risk.

  3. Step 3: Write to the Department

    Send the site, the building, the time the supply was lost and the name of the duty officer informed to the Department's email address, so that the fault is recorded against the connection.

  4. Step 4: Do not attempt to restore supply

    Do not reset tripped high-voltage switchgear, open substations or interfere with gas or heat plant. The control room will isolate the fault, restore supply by an alternative route where one exists and dispatch a fault team.

  5. Step 5: Receive confirmation

    The Department confirms by email when supply is restored and, for interruptions of more than one hour, the cause and the steps taken to prevent recurrence.

Energy emergencies. The guidance below covers the emergencies the Department plans for. It supplements, and does not replace, the emergency procedures of your site.

Electrical fire or arcing
Raise the site fire alarm, leave the area and tell the duty officer. Do not use water on electrical equipment. The control room isolates the supply to the building on the duty officer's report.
Smell of gas
Do not operate electrical switches, open doors and windows, leave the building and tell the duty officer, who will have the gas supply to the building isolated. Do not re-enter until the Department's inspector has declared the building safe.
Fallen or damaged overhead line
Keep at least ten metres away and keep others away. Treat every line as live. Tell the duty officer, who will have the line isolated before anyone approaches it.
Loss of heat at Southbank Terminal
The heat network is supplied by Southbank Combined Heat and Power Station with the boiler plant as standby. Report a loss of heat to the duty officer; standby boilers are brought on within thirty minutes.
Widespread loss of supply
If supply is lost at more than one site, the control room follows the restoration order agreed with member organisations: Central Exchange, Southbank Terminal, Northgate Relay, Westbrook Distribution Site, Eastfield Campus, Meridian Court and then the smaller sites. Member organisations are kept informed by email throughout.

Unplanned interruptions during the transition period. Five unplanned interruptions were recorded between 10 August and 5 September 2026. Supply availability across the six principal sites over the period was 99.97 per cent.

Unplanned supply interruptions, 10 August to 5 September 2026
SiteDateDurationArea affectedCause and restoration
Northgate Relay14 August 202623 minutesEast wingTransformer 2 protection operated; supply restored from transformer 1
Meridian Court19 August 20261 hour 12 minutesWhole siteCable fault on the 11 kV feeder; repaired and re-energised
Westbrook Distribution Site27 August 202641 minutesWarehouses 3 to 6Cable joint failure; supply restored by alternative route
Eastfield Campus1 September 20268 minutesLaboratory blockLow-voltage board tripped; reset by fault team
Southbank Terminal4 September 202617 minutesTerminal buildingCombined heat and power station tripped; supply restored from the Network

Interruptions and availability are reported quarterly on the Statistics page. For the connection points named in the schedule, see Connections; for the reporting of dangerous installations, see Installation Safety. Questions about the schedule may be sent to contact@energy.gov.vin.