Statistics

The Energy Department of the Velocity Interoperability Network publishes statistics on the supply it oversees and the services it provides: electricity supplied, demand by site, the generation mix, supply interruptions and availability, installation inspections and connection applications. This first release covers the transition period from 10 August to 5 September 2026, during which member organisations transferred their energy functions to the Department, and records the position at establishment on 6 September 2026.

The figures are drawn from the metering of the generating stations and primary substations, from the log of the supply control room, and from the registers transferred to the Department by member organisations. Figures for the transition period are provisional and will be revised in later releases where late returns are received.

The position at establishment. The figures below record the Department at the point of establishment.

412 MW
Generating capacity serving the Network at establishment
11
Connections on the register: nine connected, one accepted and one under assessment
2,316
Certified installations on the register at establishment
148
Installers on the register at establishment

Activity during the transition. Before the Department was established, the generating stations, the control room and the inspection of installations continued under interim arrangements. The activity recorded under those arrangements is shown below so that the series is continuous with the Department's own reporting.

Recorded activity, 10 August to 5 September 2026
Measure10 to 23 August24 August to 5 SeptemberTotal
Electricity supplied (GWh)63.165.3128.4
Renewable output (GWh)23.624.848.4
Unplanned supply interruptions235
Planned outages completed437
Installation inspections carried out118134252
Installations found defective81119
Connection applications received91221
Connection offers issued369

The rise in inspections and connection applications between the two halves of the period reflects the completion of the transfer of registers and the publication of the incoming Department's procedures. Peak demand of 286 megawatts was recorded at 18:40 on 27 August 2026; average demand over the period was 198 megawatts.

Output by station. The table below records the capacity and output of each generating station, its load factor over the period and its share of the electricity supplied. Load factor is output as a proportion of the output the station would have produced at full capacity throughout the period.

Capacity, output and load factor by station, 10 August to 5 September 2026
StationCapacityOutputLoad factorShare of supply
Ridgeway Gas Turbine Station180 MW52.1 GWh44.7%40.6%
Southbank Combined Heat and Power Station64 MW27.9 GWh67.3%21.7%
Fenmoor Wind Array96 MW29.1 GWh46.8%22.7%
Eastfield Solar Array and rooftop arrays48 MW8.3 GWh26.7%6.5%
Coldwater Hydro Station24 MW11.0 GWh70.7%8.6%
Total412 MW128.4 GWh48.1%100%

Supply availability. Five unplanned interruptions were recorded during the period. Availability is the proportion of the period during which each site was supplied, and the Network figure is weighted by the demand of each site.

Unplanned interruptions and availability by site, 10 August to 5 September 2026
SiteInterruptionsTime without supplyAvailability
Central Exchange00 minutes100%
Southbank Terminal117 minutes99.96%
Northgate Relay123 minutes99.94%
Westbrook Distribution Site141 minutes99.90%
Eastfield Campus18 minutes99.98%
Meridian Court11 hour 12 minutes99.82%
Six principal sites, weighted by demand52 hours 41 minutes99.97%

Capacity from September 2026. The figures below record the capacity the Department has established for its first months of operation.

40 MW
Minimum generating reserve held by the control room at all times
22
Installation inspectors certifying and inspecting installations from establishment
412
Installations whose periodic inspection falls due before 31 December 2026
84 MW
Renewable generating capacity to be added under the Renewable Programme by 2029

The Department will publish statistics quarterly, alongside the Generation and Supply Statement. The next release, covering the quarter ending 30 September 2026, will be published in October 2026 and announced in the Newsroom. For the stations these figures report on, see Generation and Supply; for the interruptions, see Outages and Emergencies; for the programme against which the renewable share is measured, see the Renewable Programme. Questions about these figures may be sent to contact@energy.gov.vin.